QSB STEEL is proud to be a reputable unit providing customers with a complete solution including consulting, design, manufacturing, and erection of high quality steel structure products. Since its establishment in 2010, QSB STEEL has implemented more than 1000 steel structure projects in Southeast Asia. QSB Steel offers customers a variety of choices including: factories, warehouses, high-rise buildings, heavy industrial projects, commercial centers, exhibition centers, transportation infrastructure (station, yard fly…).
QSB Steel specializes in designing, manufacturing, supplying and erecting pre-engineered steel buildings for projects such as Factories, Warehouses, Wedding Restaurants, Exhibition Centers, Galleries, Warehouses, Supermarket, Steel Structure, Cold Storage, Factory of medical equipment, Factory for rent.
Please refer to 10 typical projects implemented by QSB STEEL
Factory project of UNIVERSAL ROBINA Company (URC Vietnam) is located at Road No. 6, VSIP 1, Binh Duong. The project with the investor is URC Vietnam (Philippines) – a producer of drinking water products, C2, Cream-O, ..
The highlight that QSB STEEL has created outstanding value in this project is its fast progress response time of 4.5 months with a total volume of large steel structures, scale: 10,000m².
Location: Lot 1, N3 Road, High-Tech Park, Long Thanh My, District 9, HCMC
Area: 10,000 m2, construction time 6 months
With UHC, QSB STEEL is the general contractor for concrete and steel for the items including factories, offices, internal roads, underground water tanks, water treatment tanks, mezzanine floors, …
This is considered one of the modern medical equipment factories – the first unit in Vietnam to produce Stent device – Stent is a mesh tube, used to treat narrow arteries, put stent in blocked artery sites to improve blood circulation as well as prevent artery rupture.
Location: Phu My 1 Industrial Park, Tan Thanh, Ba Ria Vung Tau
QSB STEEL Construction of concrete, fabrication and erection of steel structures with scale: 5,000m² in 2014. Construction period is 90 days.
CS WIND is a wind tower factory with electricity – the leading unit in the world producing electric wind towers.
Project on investment and construction of a road tunnel through DEO CA, National Highway 1, Phu Yen Province and Khanh Hoa Province in the form of BOT and BT
Location: National Highway 1A – Phu Yen and Khanh Hoa provinces
Investor: Deo Ca Investment Joint Stock Company
Location: Dong Hoa district, Phu Yen province with the Volume of steel: 700 tons.
Difference in design, professional in erection. The design of the Deo Ca toll booth was awarded the first prize in the National Architecture Awards 2018, the public architecture category. Before embarking on the construction planning, Deo Ca Joint Stock Company launched an overall architectural design contest for the project. Through the selection process, in the end, the architectural plan of Atelier Dubosc et Associés (France) is highly appreciated by experts and decided to choose it as a construction plan.
The project implemented by QSB STEEL team has affirmed the position and strength of the QSB brand in the steel structure market.
View more: Nhà thép tiền chế
The highlight that QSB STEEL has created outstanding value in this project is its fast 77-day fast construction time with the total volume of large-scale steel structures.