Location: Ho Hoc Lam, Binh Tan District, City. HCM City Construction time: 90 days View more: Nhà thép tiền chế Duy Tan plastic warehouse project in Binh Tan district, HCM city is one of the quality pre-engineered warehouses that were fabricated and installed by QSB STEEL in 2011. This is one of the beautiful and quality […]
CS Wind Vietnam Factory Location: Phu My 1 Industrial Park, Tan Thanh, Ba Ria Vung Tau Construction and erection of steel structures with scale: 5,000m² View more: Nhà thép tiền chế CS WIND VIETNAM PROJECT CS WIND project with the highlight of windmills is one of the attractions of the project. QSB STEEL processed and erection […]
Location: Kampong Cham province, Cambodia. Scale: 3000 m2 completed in 60 days, 2015. The rice warehouse project in Kampong Cham province, Cambodia is one of the export projects processed and erection by QSB STEEL in Cambodia. View more: Nhà thép tiền chế With a scale of 3000 m2, the rice warehouse is designed and processed by […]
THIEN PHU SI FACTORY PROJECT Location: Duc Hoa 3 Industrial Park, Long An Province. Thien Phu Si steel structure factory with a large scale Total area: 21,000 m2, completed for 120 days. View more: Nhà thép tiền chế Some typical features of the project THIEN PHU SI Thien Phu Si factory project was constructed by QSB […]
Location: 16 Hai Ba Trung, Ward 2, City. Ben Tre, Ben Tre Province. Volume of steel: 320 tons completed in 90 days. View more: Nhà thép tiền chế Dong Khoi Wedding Center project is one of the major projects that QSB fabricated steel structures in 2013. The project with a total steel volume up to 320 […]
Location: 449 Binh Gia, Ward 9, City. Vung Tau, Ba Ria – Vung Tau province. Completed in 2013. View more: Nhà thép tiền chế SABECO Beer warehouse project is one of the beautiful and high-quality pre-engineered warehouse constructions processed and installed by QSB STEEL in 2013 in Ba Ria – Vung Tau province. See details: Top […]
Location: Phuoc Lap commune, Tan Phuoc district, Tien Giang province. Scale: 5000 m2 with 90 days construction time. View more: Nhà thép tiền chế Minh Hung Mosquito Net Factory project is one of the steel structure factory projects that are fabricated and erection by QSB STEEL with a scale of 5000 m2 at the end of […]
United Healthcare Factory (UHC) Location: Lot 1, N3 Road, High-Tech Park, p. Long Thanh My, District 9, HCMC Area: 10,000 m2 View more: Nhà thép tiền chế UNITED HEALTHCARE FACTORY (UHC) UHC is a large medical equipment factory project that QSB STEEL completed in 2014. The 10,000-square-meter project is one of the major projects that elevates […]
SV WORLD HOTEL & CASINO CAMBODIA 10 FLOOR BUILDING PROJECT Location: SIHANOUK VILLE CAMBODIA Large-scale steel structure workshop with total steel volume of 600 tons Some highlights of the project SV WORLD HOTEL & CASINO CAMBODIA 10-Floor Building SV WORLD HOTEL & CASINO CAMBODIA 10-floors Building Project with a total area of 8800 m2 for […]
Location: Nguyen Tat Thanh, National Highway 1A, Ly Van Lam, Ca Mau City Investor: Nam Binh Service and Trading Co., Ltd. Scale: Phase 1: 2,000m2, Phase 2: 5,000m2 with a steel volume of 70 tons View more: Nhà thép tiền chế Huyndai 3S Ca Mau Showroom project has been fabricated and erection of steel structures by […]
Location: Long Binh Industrial Park, Dong Nai Province Scale: 5000 m2 View more: Nhà thép tiền chế The Olam Spice Plant project was completed and constructed by QSB STEEL in 2013. With the scale of more than 5000 m2, Olam is considered one of the typical factory projects, meeting the quality standards of the province. Dong […]
Location: Phan Thiet city, Binh Thuan province View more: Nhà thép tiền chế The Phan Thiet Car Parking Project is a usable application of steel structures. It can be seen that steel structure erection is widely used for the current garage needs. The project is designed and constructed to meet the advantages of economy, quality, safety […]