Project location: Ward 2, My Tho City, Tien Giang Province Total steel plate weight: >40 tons Project images Previous Next Project information The special feature of the project is the complex steel structure and artistic lighting. This is considered a highlight on the embankment of the Tien River, adorning a shimmer in the evening on […]
Project name: Ca Cam Bridge Location: Nguyen Van Linh Street, Binh Thuan Ward, District 7 Industry: Transportation infrastructure Completion time: currently under construction PROJECT IMAGES HIGHLIGHTS OF THE PROJECT The Cau Ca Cam project is considered one of the most aesthetically pleasing and efficient transportation infrastructure projects at QSB Steel. From a distance, the structure […]
Project of name: Deo Ca BOT Project location: Highway 1A – Dong Hoa district, Phu Yen and Khanh Hoa provinces Investor: Deo Ca Investment Joint Stock Company Industry: Infrastructure & transport Total steel plate weight: more than 700 tons Year of installation: 2018. Project images Project information Differences in design and installation. The design of the building […]
Project name: Ben Luc Toll Station Location: Intersection between Ben Luc and Duc Hoa districts, Long An province Industry: Technical Infrastructure – Transportation Steel quantity: 140 tons Completion time: 121 days in 2017. PROJECT IMAGES HIGHLIGHTS OF THE PROJECT The Ben Luc toll station project was processed and installed by QSB Steel in 2017 with […]
Project name: Phu My 3 Entrance Gate Location: Phu My 3 Deep Sea Industrial Zone, Phuoc Hoa Ward, Phu My Town, Ba Ria-Vung Tau Province Industry: Industrial construction Steel weight: nearly 15,000 tons Completion time: 35 days Project images Project highlights The steel frame design on both sides is compared to the wingspan of a […]