Project name: Ca Cam Bridge
Location: Nguyen Van Linh Street, Binh Thuan Ward, District 7
Industry: Transportation infrastructure
The Ca Cam Bridge project is considered one of the most aesthetically pleasing and efficient transportation infrastructure projects at QSB Steel. From a distance, the structure appears like a lotus on the water, which is a highlight of the project’s design.
The Ca Cam Bridge project in District 7 makes it easier for people to travel from Nguyen Van Linh street to Road 10, Nguyen Hien Middle School, and The Blue Star area. Not only does it assist in transportation, but it also adds to the perfect beauty of the area.
The steel components will be coated with an anti-corrosion epoxy primer layer of 100 microns and a PU topcoat of 60 microns to improve durability over time. Additionally, all materials used have excellent corrosion resistance and longevity.
Each component will be firmly connected to meet the demands of any weather conditions. To ensure the project’s quality and progress, the QSB team has closely monitored the design, production of each component, and meticulously inspected all products according to strict standards. The quality assessment and acceptance work satisfy customer requirements.
At QSB Steel, the solution is high quality, aesthetics, fast and accurate, minimal maintenance and repair, high reusability, and efficiency.
The Ca Cam Bridge project is currently under construction and will be completed before Lunar New Year.