Project name: Duc Tin Factory
Location: No. 6, Linh Trung 3 Industrial Park, An Tinh Commune, Trang Bang District, Tay Ninh Province.
Scale: Workshop A: 4,413 m2; workshop E: 1,175 m2; workshop D: 1,950 m2. Total: 8,000m2
Completion time: Workshop A: 80 days, Workshop E: 59 days, Workshop D: 42 days.
The project name is Duc Tin Factory located at No. 6, Linh Trung 3 Industrial Park, An Tinh Commune, Trang Bang District, Tay Ninh Province.
The project scope includes three workshops: Workshop A: 4,413 m2, Workshop E: 1,175 m2, and Workshop D: 1,950 m2, with a total area of 8,000 m2. The construction time for each workshop is 80 days for Workshop A, 59 days for Workshop E, and 42 days for Workshop D.
QSB STEEL completed the fabrication and erection of the Duc Tin Factory with the entire chain of Workshops A, D, and E, which is considered one of the most beautiful factories in Tay Ninh Province with steel frames meeting the quality standard, fast construction progress, suitable design, and cost savings.
The Duc Tin Factory was constructed by section to meet the needs of customers.